Skip to Content
Sonoma Public Infrastructure

News Index


January 04, 2017 | Sonoma Public Infrastructure

Road Work Update

Heavy rains and freezing temperatures have kept our crewsbusy sanding roads and responding to flooding. Roadside mowing continues, aswell as pothole, viaduct, and sign repairs. Read full story


December 28, 2016 | Sonoma Public Infrastructure

Tree Recycling

Compost and mulch made from Christmas trees is highly prized for its acidic qualities. Please take advantage of one of the four convenient recycling methods available to you. Read full story


December 19, 2016 | Sonoma Public Infrastructure

Road Work Update

Potholing and roadside mowing continues, alongwith viaduct, culvert, and sign repair. Caution is advised on icy road conditions. Read full story


December 12, 2016 | Sonoma Public Infrastructure

Road Work Update

After a busy weekend responding to emergencies, ourcrews will continue fixing potholes, mowing roadside vegetation, repairingculverts, a viaduct, and signs. Read full story


December 06, 2016 | Sonoma Public Infrastructure

Road Work Update

Road Crews were out yesterday and today checking for ice andsanding as needed. Summer paving and construction is in its final phase. RoadCrews are repairing potholes, guardrails, and signs, as well as mowing roadsidevegetation, and fixing and installing culverts. Read full story


November 28, 2016 | Sonoma Public Infrastructure

Road Work Update

All paving and road construction for the summerpaving program is complete. Road Maintenance will be patching potholes, mowingroadside vegetation, cleaning and installing culverts, and repairing signs andguardrails. Final construction activities are still taking place on theHighway 12 and the Healdsburg Intermodal projects. Work continues on Adobe Roadand East Washington Street. Read full story


November 22, 2016 | Sonoma Public Infrastructure

Road Work Update

All paving and road construction for the summerpaving program is complete. Road Maintenance will be patching potholes, mowingroadside vegetation, cleaning culverts, and repairing signs andguardrails. Final construction activities are still taking place on theHighway 12 and the Healdsburg Intermodal projects. Work continues on Adobe Roadand East Washington Street. Read full story


November 15, 2016 | Sonoma Public Infrastructure

Bridge Deck Replacement on Scouts Camp Road

View a short time-lapse video ofan entire Bridge Deck Replacement on Scouts Camp Road, performed by our own inhouse bridge maintenance specialists. Read full story


November 10, 2016 | Sonoma Public Infrastructure

Check Out Our 2016 Pavement Edition Newsletter!

Our 2016 Pavement EditionNewsletter is out with new information on funding, road selection, how weresurface roads, and the many other ways we’re working to improve our roadnetwork.http://sonomacounty.ca.gov/TPW/Newsletter/2016-Pavement-Edition/ Read full story


November 07, 2016 | Sonoma Public Infrastructure

Road Work Update

Full Depth Reclamation (FDR) continues this week, and weather permitting, overlay paving as well. Road Maintenance will be patching potholes, replacing a culvert, repairing signs and guardrails, stenciling and striping on various locations. Final construction activities are still taking place on the Highway 12 and the Healdsburg Intermodal projects. Work continues on Adobe Road and East Washington Street. Read full story